For Builders — Sunlit Studio

The biggest cost isn't construction.
It's coordination.

Every delay, change order, and rework starts when teams stop working from the same information.

Cost of an unresolved decision
$0
still climbing on site
Design Lock™ engaged
Scroll
01 The Mistake

The $75K Mistake

That cost the builder $75,000 in profit margin.

02 What Happens Next

The cabinets are already ordered. The plumbing's already roughed in. The hood vent is already run. Now all of it has to change.

One 14-inch move touches three trades that had no reason to expect it.

Foreman and tradesperson reviewing plans on a luxury kitchen jobsite
03 What It Costs
$75,000

Tear out framing. Re-order cabinets. Redo the plumbing. Push the schedule back.

One decision, made two weeks too late, on a $1.5 million home.

Illustrative example based on industry data, not a specific project. Construction rework typically runs 2–20% of total project cost, with 5% commonly cited as representative. Source: Construction Industry Institute.

Torn-out range wall mid-rework, tradespeople reviewing the change on a luxury kitchen jobsite

The range wall, opened back up two weeks after framing.

04 — Design Lock™

The range location gets locked before framing starts.

This costly mistake doesn't happen — and you get to protect your margin.

Superseded Rev 1 plan next to the locked Rev 2 plan, Sunlit Studio

Rev 1 is superseded before it ever reaches the trades. Rev 2 is what gets built.

01
Locked before framing
Range, vent, and plumbing positions are resolved and confirmed before your crew ever picks up a tool.
02
One position, every trade
Cabinetry, plumbing, and ventilation all build to the same confirmed spec — nothing ordered against a plan that's about to change.
03
Verified, not assumed
Every locked decision is checked on-site before it becomes a framing, plumbing, or cabinetry problem.
Sunlit Studio design intent package, verified on-site

Every Design Lock™ decision is verified on-site — not assumed from a plan.

05 — See It Locked

See a real Design Lock™ sample.

Protecting Builder Margins Through Design Discipline